Voice & connected sites

Secure Branch Network

A documented branch network with separated access, controlled administration, and a tested connection to approved business resources.

1 branch · 2 access points · 6 data outlets

Built around your siteConfigured project quote

A written scope and price follow software, hardware, and site verification.

Discuss this package ↗

Manufacturer photos show the listed products or families. Representative components are labeled; accessories, finish, mounts, and orderable configurations are finalized in the bill of materials.

The full starting scope

Everything, unpacked.

Designed for: Small branch offices and satellite locations joining an existing business environment.

Ubiquiti UniFi Cloud Gateway Max
Manufacturer photoUCG-Max
01 / equipment · 1 included

Business gateway and network controller

Configured routing, firewall rules, administrative access, and the agreed business/guest network separation.

Equipment specifications & configuration →
Ubiquiti UniFi Switch Lite 16 PoE
Manufacturer photoUSW-Lite-16-PoE
02 / equipment · 1 included

PoE network switch

Port schedule and powered-device budget verified against the selected equipment. SFP modules and uplinks are specified when needed.

Equipment specifications & configuration →
Ubiquiti UniFi U7 Pro access point
Manufacturer photoU7-Pro
03 / equipment · 2 included

Indoor Wi-Fi access points

Wired uplinks and agreed SSIDs. Placement and coverage are verified on site; floor area alone does not establish coverage.

Equipment specifications & configuration →
trueCABLE Cat6 CMR riser cable
Representative componentRepresentative Cat6 cable
trueCABLE Cat6 toolless keystone jack
Representative componentRepresentative terminations
trueCABLE 24-port modular patch panel
Representative componentRepresentative patching
trueCABLE Cat6 patch cord
Representative componentRepresentative patch cord; lengths, colors, and quantities follow the port schedule
trueCABLE one-port wall plate
Representative componentRepresentative wall plate; port count and finish follow the outlet schedule
04 / installation · 6 outlets

Installed Cat6 data outlets

One identified permanent link per outlet, with termination, labeling, patching, and the agreed certification record. Routes and link lengths are surveyed.

APC Back-UPS Pro BX1000M tower UPS, 1000VA
Manufacturer photoBack-UPS Pro BX1000M
05 / equipment · 1 included

Network battery backup

Load and expected runtime are verified for the connected equipment. This does not establish a whole-site outage or server-runtime guarantee.

Equipment specifications & configuration →
Illustrative business server, network, and device setup
Illustrative environmentIllustrative business solution
06 / software · 1 scoped workflow

Branch access and administration

Configure the agreed business/guest boundaries, remote administration, and one supported connection to an existing business site or approved hosted resource.

Included delivery work

  • Configuration-specific equipment schedule and compatibility review
  • Installation, labeling, configuration, and the named software/integration work
  • Functional acceptance checks with recorded exceptions
  • Operator training, administrator handover, and an operating runbook
In daily operation

What you can do with it.

Use cases are implemented against the agreed application, device configuration, and operating rules.

Illustrative business server, network, and device setup
Illustrative business environment
01

Open a satellite location

Give a new team a repeatable network standard with known equipment, named administrators, and an outlet schedule.

02

Reach shared business resources

Test authorized access to a defined destination over the chosen supported VPN or secure application connection.

03

Support the branch remotely

Record network ownership, configuration backups, and recovery steps so routine changes have a controlled path.

From planning to daily use

A working system, handed over.

01

Confirm the configuration

Survey the site and agree on exact models, quantities, interfaces, licenses, mounting, access, and the workflow acceptance criteria.

02

Stage and install

Prepare devices and software, document identifiers, install the scoped infrastructure, and connect the named systems.

03

Test the actual work

Test employee and guest access, the scoped remote connection, administrator restrictions, configuration backup, and a planned connectivity recovery.

04

Train and hand over

Demonstrate the workflow, hand over access and documentation, record remaining decisions, and confirm support ownership.

Set the right expectations

What we confirm together.

Before we start

  • ISP service and an approved remote destination
  • Customer security policy and remote-access owner
  • Approved bill of materials, software entitlements, access window, and customer acceptance owner

Outside the starting scope

  • Second-site equipment, carrier service, static-IP charges, and cellular subscriptions
  • Automatic failover or always-on monitoring unless specified
  • Recurring licenses, cloud storage, maintenance, and response coverage are separate unless included in the signed agreement

Ways to expand

  • More branches
  • Secondary WAN after compatibility review
  • Servers, phones, and managed support
Make it fit your business

Start with this package.
Build around your operation.

Tell us about your locations, current systems, staff, and daily workflow. We will map the equipment and work to a reviewable scope.

Discuss Secure Branch NetworkCompare all packages →