Know what goes into the work.
One specification for every service: what we plan, what we deliver, what you provide, and how we verify the result. Download a document to share with your team or use as the starting point for a project.
Download all 40 specifications (PDF)40 of 40 service specifications
Structured cabling
Copper or fiber links, outlets, patch panels, pathways, and labels for computers, Wi-Fi, cameras, phones, and building systems.
Scope · Delivery · Acceptance · PlanningRevision 1.0 · September 6, 2026 · 3 pagesPathways and containment
Trays, conduit, sleeves, raceway, and supports carry communications cable while accounting for fill, bend radius, separation, firestopping, and access.
Scope · Delivery · Acceptance · PlanningRevision 1.0 · September 6, 2026 · 3 pagesTelecommunications rooms, racks, grounding and power
Racks, patching, network equipment, power, bonding, cooling, pathways, labels, and access, brought into one maintainable space.
Scope · Delivery · Acceptance · PlanningRevision 1.0 · September 6, 2026 · 3 pagesMoves, adds, changes, audits and remediation
Moves, additions, repairs, tracing, testing, abandoned-cable review, network-room cleanup, and records updates for existing cabling.
Scope · Delivery · Acceptance · PlanningRevision 1.0 · September 6, 2026 · 3 pagesCampus and outside-plant fiber
Route and utility discovery, civil coordination, cable construction, splicing, testing, strand records, and restoration planning, combined into one build.
Scope · Delivery · Acceptance · PlanningRevision 1.0 · September 6, 2026 · 3 pagesInside-plant fiber backbones
Selected fiber types, connectors, polarity, panels, pathways, and terminations carry high-capacity links through the building.
Scope · Delivery · Acceptance · PlanningRevision 1.0 · September 6, 2026 · 3 pagesFiber splicing and testing
Fusion splicing creates permanent strand connections. OLTS measures end-to-end insertion loss, and OTDR testing adds event-location detail when the route or acceptance plan calls for it.
Scope · Delivery · Acceptance · PlanningRevision 1.0 · September 6, 2026 · 3 pagesDark fiber and carrier demarcation
Dark fiber provides a passive optical path; carrier demarcation pins down the port, strand, inside extension, optics, power, testing, and repair responsibilities on each side.
Scope · Delivery · Acceptance · PlanningRevision 1.0 · September 6, 2026 · 3 pagesData-center white-space build-out
Racks, pathways, cabling, labels, access, and technology turnover, coordinated with the electrical, cooling, grounding, structural, fire, and security work owned by the responsible trades.
Scope · Delivery · Acceptance · PlanningRevision 1.0 · September 6, 2026 · 3 pagesData-center structured cabling
Carrier, distribution, and equipment areas connect through managed copper and fiber patch fields with planned topology, density, polarity, labels, and tests.
Scope · Delivery · Acceptance · PlanningRevision 1.0 · September 6, 2026 · 3 pagesData-center migrations and decommissioning
Services map to racks, ports, power, and owners; then cutover, validation, rollback, equipment release, media handling, removal, and final record updates run in sequence.
Scope · Delivery · Acceptance · PlanningRevision 1.0 · September 6, 2026 · 3 pagesDCIM enablement
Sites, rooms, racks, assets, ports, circuits, and sensors get normalized, supported data sources connect, and physical changes gain a defined path into the model.
Scope · Delivery · Acceptance · PlanningRevision 1.0 · September 6, 2026 · 3 pagesNetwork core, routing, switching and segmentation
Switching, routing, VLANs, address plans, security policy, uplinks, PoE, management access, configuration backups, and recovery, designed together.
Scope · Delivery · Acceptance · PlanningRevision 1.0 · September 6, 2026 · 3 pagesBusiness and guest Wi-Fi
Business Wi-Fi carries staff and operational devices; guest Wi-Fi gives visitors separated access.
Scope · Delivery · Acceptance · PlanningRevision 1.0 · September 6, 2026 · 3 pagesDistributed antenna systems and ERRCS
A distributed antenna system carries radio signals through a building or campus.
Scope · Delivery · Acceptance · PlanningRevision 1.0 · September 6, 2026 · 3 pagesPrivate 5G and CBRS
Private LTE or 5G combines compatible devices, SIM or eSIM identities, radios, transport, and a mobile core; many US deployments use CBRS spectrum under FCC Part 96.
Scope · Delivery · Acceptance · PlanningRevision 1.0 · September 6, 2026 · 3 pagesOutdoor and point-to-point wireless
Outdoor wireless extends network service to remote buildings, cameras, gates, and equipment.
Scope · Delivery · Acceptance · PlanningRevision 1.0 · September 6, 2026 · 3 pagesVideo surveillance
Camera placement, lighting, network capacity, recording, retention, permissions, health alerts, and evidence export, designed around the events each view must capture.
Scope · Delivery · Acceptance · PlanningRevision 1.0 · September 6, 2026 · 3 pagesAccess control
Credentials, readers, controllers, locks, door contacts, request-to-exit devices, schedules, power, network, and administrator policy, with project-specific door-hardware and life-safety review.
Scope · Delivery · Acceptance · PlanningRevision 1.0 · September 6, 2026 · 3 pagesIntrusion alarms and monitoring
Sensors, zones, users, arming rules, communication paths, verification, notification, and response instructions, working as one system.
Scope · Delivery · Acceptance · PlanningRevision 1.0 · September 6, 2026 · 3 pagesIntercom, paging, and mass communication
Intercom handles two-way calls, paging distributes voice or tones, and mass communication coordinates urgent messages, each with its own coverage, priority, accessibility, and approval requirements.
Scope · Delivery · Acceptance · PlanningRevision 1.0 · September 6, 2026 · 3 pagesSecurity systems integration
Supported APIs and standards can correlate video, access, intrusion, intercom, visitor, and identity events.
Scope · Delivery · Acceptance · PlanningRevision 1.0 · September 6, 2026 · 3 pagesVisitor and contractor entry
Pre-registration, arrival, identity checks, host approval, badges, temporary credentials, escort rules, emergency accounting, checkout, accessibility, and record retention, connected into one process.
Scope · Delivery · Acceptance · PlanningRevision 1.0 · September 6, 2026 · 3 pagesParking, perimeter, and vehicle entry
Lane geometry, credentials, gates, safety inputs, intercoms, cameras, lighting, outdoor networks, power, drainage, civil pathways, and manual release, engineered together.
Scope · Delivery · Acceptance · PlanningRevision 1.0 · September 6, 2026 · 3 pagesDigital signage
Commercial displays, mounts, players, content management, templates, schedules, data feeds, permissions, power, network, accessibility, monitoring, and fallback content, treated as one system.
Scope · Delivery · Acceptance · PlanningRevision 1.0 · September 6, 2026 · 3 pagesAudiovisual and collaboration systems
Displays, cameras, microphones, speakers, acoustics, controls, meeting platforms, accounts, network, power, lighting, furniture, and support, coordinated as one room.
Scope · Delivery · Acceptance · PlanningRevision 1.0 · September 6, 2026 · 3 pagesPoint-of-sale, ordering, and queue systems
Terminals, payment devices, printers, kitchen or service displays, accounts, software, segmented networks, internet, local services, power, vendor support, and fallback procedures, connected end to end.
Scope · Delivery · Acceptance · PlanningRevision 1.0 · September 6, 2026 · 3 pagesInventory workflows
Receiving, put-away, picking, transfer, count, sale, return, and disposal connect through identifiers, labels, scanners, printers, handhelds, wireless coverage, software transactions, and exception handling.
Scope · Delivery · Acceptance · PlanningRevision 1.0 · September 6, 2026 · 3 pagesAsset tracking
Scans, RFID, BLE, UWB, GPS, cellular, Wi-Fi, cameras, or custody events, chosen by required accuracy, update rate, environment, battery life, privacy, cost, and integration.
Scope · Delivery · Acceptance · PlanningRevision 1.0 · September 6, 2026 · 3 pagesOperational automation and integration
Supported APIs, webhooks, files, records, alerts, approvals, schedules, and devices connect with validation, limited permissions, duplicate protection, logs, retries, and manual recovery.
Scope · Delivery · Acceptance · PlanningRevision 1.0 · September 6, 2026 · 3 pagesEnvironmental and facility monitoring
Sensors, placement, gateways, power, network, timestamps, thresholds, persistence, alerts, acknowledgement, escalation, retention, and maintenance, assembled as one monitoring system.
Scope · Delivery · Acceptance · PlanningRevision 1.0 · September 6, 2026 · 3 pagesOperational technology networks
Asset discovery, approved data paths, industrial switching, remote access, monitoring, backups, maintenance windows, testing, and rollback, all with process-owner approval.
Scope · Delivery · Acceptance · PlanningRevision 1.0 · September 6, 2026 · 3 pagesNetwork operations and monitoring
Covered assets and services connect to health checks, telemetry, thresholds, tickets, escalation, authorized actions, change records, and review.
Scope · Delivery · Acceptance · PlanningRevision 1.0 · September 6, 2026 · 3 pagesBreak-fix triage and field dispatch
Incident intake, remote checks, site access, vendor boundaries, technician skills, tools, parts, field work, acceptance testing, and cause notes form one connected path; timing, travel, and rates stay contract-specific.
Scope · Delivery · Acceptance · PlanningRevision 1.0 · September 6, 2026 · 3 pagesTechnology lifecycle and refresh
Asset records, support dates, licenses, vulnerabilities, capacity, failures, spares, compatibility, budgets, staged migration, rollback, data handling, and disposal feed one plan.
Scope · Delivery · Acceptance · PlanningRevision 1.0 · September 6, 2026 · 3 pagesQuarterly reviews, roadmaps, and vendor coordination
Periodic reviews reconcile service performance, recurring problems, monitoring, lifecycle, capacity, security, projects, contracts, vendors, budgets, prior actions, and business changes.
Scope · Delivery · Acceptance · PlanningRevision 1.0 · September 6, 2026 · 3 pagesBusiness server deployment
Plan, supply, install, configure, and validate the server environment that hosts a customer’s approved business applications and records.
Scope · Delivery · Acceptance · PlanningRevision 1.0 · September 6, 2026 · 3 pagesHandheld and business device deployment
Select, stage, connect, and validate handheld computers, scanning devices, charging equipment, and label printers for an agreed business workflow.
Scope · Delivery · Acceptance · PlanningRevision 1.0 · September 6, 2026 · 3 pagesCustom business software development
Design, build, integrate, test, and hand over an internal application around the customer’s named business workflow and operating responsibilities.
Scope · Delivery · Acceptance · PlanningRevision 1.0 · September 6, 2026 · 3 pagesBusiness reporting and sales forecasting
Connect approved operational data to clear reports and evaluated forecasts that support purchasing, preparation, staffing, and location planning.
Scope · Delivery · Acceptance · PlanningRevision 1.0 · September 6, 2026 · 3 pages