Servers & continuity

Business Server Growth

A larger tower-server planning package for growing applications, with configuration-specific storage, power, and migration choices.

1 expansion-ready tower · documented workload transition

Built around your siteConfigured project quote

A written scope and price follow software, hardware, and site verification.

Discuss this package ↗

Manufacturer photos show the listed products or families. Representative components are labeled; accessories, finish, mounts, and orderable configurations are finalized in the bill of materials.

The full starting scope

Everything, unpacked.

Designed for: Businesses consolidating approved workloads or outgrowing a basic office server.

Lenovo ThinkSystem ST250 V3 configurable tower server
Manufacturer photoThinkSystem ST250 V3
01 / equipment · 1 included

Lenovo ThinkSystem ST250 V3 server

Choose the supported CPU, memory, drive-bay/backplane, RAID/HBA, and power configuration. Redundancy is included only when the approved configuration specifies it.

Equipment specifications & configuration →
APC Smart-UPS SMT1500RM2UC rackmount UPS, 1500VA
Manufacturer photoSmart-UPS SMT1500RM2UC
02 / equipment · 1 included

UPS planning selection

Final form factor, electrical supply, installation position, load, and runtime are verified for the server and network.

Equipment specifications & configuration →
Illustrative business server, network, and device setup
Illustrative environmentIllustrative business solution
05 / software · 1 scoped workflow

Workload transition and operating runbook

Plan one named workload transition with backup, sample reconciliation, rollback, owner acceptance, and administration documentation.

Included delivery work

  • Configuration-specific equipment schedule and compatibility review
  • Installation, labeling, configuration, and the named software/integration work
  • Functional acceptance checks with recorded exceptions
  • Operator training, administrator handover, and an operating runbook
In daily operation

What you can do with it.

Use cases are implemented against the agreed application, device configuration, and operating rules.

Illustrative business server, network, and device setup
Illustrative business environment
01

Expand application capacity

Size an approved workload from actual memory, storage, user, and I/O requirements before choosing components.

02

Improve storage and power options

Evaluate supported hot-swap and redundant options against the business recovery requirement; the final configuration records the choices.

03

Make a controlled transition

Move a named workload during an agreed window with verified records, owner testing, and an executable rollback decision.

From planning to daily use

A working system, handed over.

01

Confirm the configuration

Survey the site and agree on exact models, quantities, interfaces, licenses, mounting, access, and the workflow acceptance criteria.

02

Stage and install

Prepare devices and software, document identifiers, install the scoped infrastructure, and connect the named systems.

03

Test the actual work

Validate the ordered configuration, workload access, monitored health, backup/restore sample, migration reconciliation, and rollback record.

04

Train and hand over

Demonstrate the workflow, hand over access and documentation, record remaining decisions, and confirm support ownership.

Set the right expectations

What we confirm together.

Before we start

  • Measured workload requirements and platform compatibility
  • Approved migration window, application owner, and backup destination
  • Customer-provided compatible rack space for the gateway, switch, and rackmount UPS; separate ventilated placement for the tower server
  • Approved bill of materials, software entitlements, access window, and customer acceptance owner

Outside the starting scope

  • Automatic high availability or zero downtime
  • Unlisted workloads, a second server, storage appliances, and recurring licenses
  • Recurring licenses, cloud storage, maintenance, and response coverage are separate unless included in the signed agreement

Ways to expand

  • A second recovery host
  • Higher-capacity storage or networking
  • Formal recovery and maintenance coverage
Make it fit your business

Start with this package.
Build around your operation.

Tell us about your locations, current systems, staff, and daily workflow. We will map the equipment and work to a reviewable scope.

Discuss Business Server GrowthCompare all packages →