GHT: Glass House Technologies
Resilient pathways and controlled change

It has to keep running in weather that shuts everything else down.

Plants, substations, operations buildings, remote sites, and control environments, with engineered fiber, industrial networks, monitoring, access, and video that hold up when the weather does not.

Common buyersEngineering and operations · OT and IT security · Facilities · Capital programs
Common triggersFacility expansion · Control-network modernization · Fiber or communications upgrade · Physical security project
The problems we design around

Start with what creates delay, risk, and repeat work.

01

Sites combine distance and harsh conditions

Remote buildings, yards, electrical environments, weather, long pathways, and limited access change the equipment and installation method.

02

Change authority is distributed

Operations, engineering, cybersecurity, safety, vendors, control owners, and site security need an agreed method and acceptance path.

03

Failure consequences vary by system

Network zones, redundancy, spares, environmental monitoring, rollback, and test depth must follow actual operational criticality.

Systems that fit the operation

One environment. Connected layers.

Every layer is scoped with its purpose, dependencies, administrator, acceptance evidence, and change boundary. Select systems can stand alone; integrated programs share one site plan and closeout.

01

Fiber and building backbone

High-capacity links between rooms, buildings, production areas, and critical systems with a testable handoff.

  • Single-mode and multimode design
  • Pathway, enclosure, and termination planning
  • Fusion splicing and loss testing as scoped
  • Backbone labeling and as-built records
Pricing pathFiber is priced from route, strand count, termination, pathway, access, and test requirements after a site or drawing review.
02

Operational technology network

A documented network boundary for production, controls, building systems, and vendor-managed equipment that respects uptime and safety constraints.

  • IT and OT asset/data-flow discovery
  • Zone, segment, and trusted-path design
  • Industrial switching, fiber, wireless, and enclosure options
  • Change, rollback, remote-access, and validation plan
Pricing pathEngineering-led scope. Price depends on existing controls, approved downtime, environmental rating, redundancy, and required validation.
03

Environmental and facility monitoring

Visibility into temperature, humidity, water, power, doors, and other site conditions before they become operational surprises.

  • Condition and threshold definition
  • Sensor, gateway, and network placement
  • Alert routing and escalation design
  • Dashboard, retention, testing, and maintenance plan
Pricing pathDesign-to-quote from sensor types, quantities, coverage, alerting, platform licensing, and integration requirements.
04

Access control and controlled entry

Credentialed doors, gates, restricted areas, and entry records tied to the way the facility actually operates.

  • Door and hardware review
  • Local or cloud-managed credentials
  • Schedules, groups, and administrator setup
  • Intercom and camera coordination where required
Pricing pathPublished one-door and four-door packages are shown below; door condition and life-safety interfaces are verified before agreement.
05

Video security and operational visibility

Camera placement, recording, viewing, and retention planned around the decisions the footage must support.

  • Indoor, outdoor, overview, detail, and specialty views
  • Local, cloud-managed, and open-platform options
  • Retention and viewing-station planning
  • Placement schedule, naming, and administrator handoff
Pricing pathLocal and cloud-managed camera packages plus installed per-camera options are shown below.
06

Parking, perimeter, and vehicle entry

Coverage and control for parking areas, gates, loading zones, vehicle queues, and exterior approaches.

  • Outdoor network and pathway plan
  • Gate, intercom, credential, and vehicle-view options
  • Overview and detail camera placement
  • Lighting, mounting, weather, and retention coordination
Pricing pathDesign-to-quote from civil pathway, power, mounting, gate hardware, camera purpose, coverage area, and trenching requirements.
Product options and published pricing

Concrete starting points—not a mystery quote.

These are current GHT catalog planning prices for standard scope. They show the hardware class, included installation, and recurring platform cost when applicable. Site conditions, pathways, quantities, schedule, taxes, licensing term, and verified scope can change the fixed agreement.

ProfessionalUbiquiti UniFi

Business Command

Network + cameras on one platform, in one rack.

Up to ~10,000 sq ft · ~60 devices

Planning price · starting at$11,450
  • Ubiquiti UniFi Dream Machine ProUniFi Dream Machine ProRackmount 10G gateway & controller
  • Ubiquiti UniFi Switch 24 PoEUniFi Standard 24 PoE switch24 ports of PoE
  • Ubiquiti UniFi U7 Pro access point3× UniFi U7 Pro access pointsCeiling-mounted Wi-Fi 7
  • Ubiquiti UniFi Protect G5 Turret Ultra camera4× UniFi G5 Turret Ultra cameras2K, night vision, no camera fees
  • Ubiquiti UniFi Network Video RecorderUniFi Network Video Recorder + 8TB~30 days of continuous footage
View and configure options
EnterpriseUbiquiti UniFi

Flagship

Full building coverage: network, surveillance & door access.

Up to ~25,000 sq ft · 150+ devices

Planning price · starting at$22,500
  • Ubiquiti UniFi Dream Machine Pro MaxUniFi Dream Machine Pro Max10G gateway for 2,000+ clients
  • Ubiquiti UniFi Switch Pro Max 24 PoEUniFi Pro Max 24 PoE switch2.5G ports + 10G uplinks, 400W PoE
  • Ubiquiti UniFi U7 Pro access point6× UniFi U7 Pro access pointsWall-to-wall Wi-Fi 7
  • Ubiquiti UniFi Protect G5 Turret Ultra camera8× UniFi cameras (2K + 4K mix)G5 Turret Ultra + G5 Pro 4K
  • Ubiquiti UniFi Network Video Recorder ProUniFi NVR Pro + 16TB storageExtended retention, expandable
View and configure options
EnterpriseVerkada

Vault 4

Enterprise access control, unified with your Verkada cameras.

4 doors

Planning price · starting at$9,600+ $100/mo
  • Verkada AC42 4-door access controller (AC41 is end-of-sale; AC42 is the current model)Verkada AC41 controller4-door access controller
  • Verkada AD34 door reader (AD33 is end-of-sale; AD34 is the current model)4× Verkada AD33 readerBadge, mobile & Bluetooth unlock
  • HES 9600 Series electric door strike4× electric strikeFail-secure or fail-safe, matched to your doors
  • trueCABLE Cat6 CMR riser cable4× Cat6 data dropsTerminated, tested & certified
  • 4× Verkada Access cloud licenseCommand platform, schedules, alerts
View and configure options
Installed option pricing

Build the site one requirement at a time.

Unit prices are planning references attached to the current catalog. Quantities and compatibility are validated before agreement.

Outdoor Wi-Fi access pointUniFi U7 Outdoor for patios, lots & yards$845
4K zoom cameraUniFi G5 Pro with 3× optical zoom$1,325
Access-controlled doorUniFi Access reader, hub & strike, installed$1,875
Rackmount battery backupPure sine wave UPS for the head-end$690
Extra 8TB camera storageInstalled, provisioned and retention-verified$900
Credentials, 25-packBadges or fobs, programmed and ready to hand out$300
Integrated commercial project floor$5,000

Catalog items below that amount remain useful planning references. Targeted industry programs are built around the complete operational outcome, not an isolated device. Custom media displays, inventory, ordering, automation, AV, fiber, and OT systems are quoted after their real dependencies are mapped.

Price the facility
What to expect

A controlled path from operating problem to usable handoff.

01

Readiness

Confirm the organization, site, current condition, desired outcome, stakeholders, timing, and decision path.

02

Field and design

Validate pathways, devices, counts, dependencies, work windows, customer responsibilities, and acceptance criteria.

03

Agreement and staging

Fix the scope, products, exclusions, schedule, change boundary, payment milestones, and material plan.

04

Deployment

Protect live operations, coordinate access, communicate milestones, test work, and preserve rollback where required.

05

Closeout

Deliver labels, results, photos, as-builts, credentials through an approved secure path, training, warranty terms, and the next owner.

The operating outcome

What should be different after the work.

  1. 01Environment-appropriate pathways and equipment
  2. 02Controlled communication between operational zones
  3. 03Documented change, rollback, and acceptance
  4. 04Better visibility at remote and secure sites
Your utilities & critical infrastructure environment

Start with the problem. Leave with a clear system.

Tell us the site, the workflow, what is failing now, and the outcome that matters. We will turn it into a planning path with visible assumptions and product options.